PM Surya Ghar Muft Bijli Yojana – 5Kw-Subsidy-94800

PM Surya Ghar Muft Bijli Yojana – 5Kw-Subsidy-94800

2,585,000.00

PM Surya Ghar Muft Bijli Yojana – 5Kw-Subsidy-94800

  • Solar mono half-cut: 520Wp (with 5 Years Warranty)
  • Array Combiner Box With Fuse 1 In 1 Out with SPD
  • ACDB with SPD Class 2, with CB (3Ph)
  • Solar Grid Tied Inverter 3KW – 1 Phase with GPRS dongle (with 5 Years Warranty)
  • 1Cx4 SQ. MM Solar DC Cable
  • Cable, 3Cx4 SQ. MM PVC Copper
  • Earthing Kit, 1.5m 14mm cu bonded rod
  • Lightning Arrestor 2M Conventional type
  • 1Cx10 SQ. MM AL single strand Earthcable
  • Installation Kit
  • All products are TPSSL approved or make
  • Overall System Warranty 5 Years
Quantity

Description

PM Surya Ghar Muft Bijli Yojana -5Kw-Subsidy-94800

  • Solar mono half-cut: 520Wp (with 5 Years Warranty)
  • Array Combiner Box With Fuse 1 In 1 Out with SPD
  • ACDB with SPD Class 2, with CB (3Ph)
  • Solar Grid Tied Inverter 3KW – 1 Phase with GPRS dongle (with 5 Years Warranty)
  • 1Cx4 SQ. MM Solar DC Cable
  • Cable, 3Cx4 SQ. MM PVC Copper
  • Earthing Kit, 1.5m 14mm cu bonded rod
  • Lightning Arrestor 2M Conventional type
  • 1Cx10 SQ. MM AL single strand Earthcable
  • Installation Kit
  • All products are TPSSL approved or make
  • Overall System Warranty 5 Years

The PM Surya Ghar: Muft Bijli Yojana process involves online registration, application for rooftop solar installation, obtaining feasibility approval, and installing the system. After installation, the system is inspected, and once approved, the subsidy is credited to the beneficiary’s bank account. 

Here’s a detailed breakdown:
1. Registration:

Visit the official PM Surya Ghar website and register by providing details like state, electricity distribution company, consumer number, and contact information. 

2. Application:

Log in with your consumer number and mobile number, and apply for the rooftop solar installation through the online portal. 

3. Feasibility Approval:

Wait for the feasibility approval from your electricity distribution company (DISCOM). 

4. Vendor Selection & Installation:

Once approved, select a registered vendor within your DISCOM and proceed with the installation of the solar plant. 

5. Net Meter Installation & Commissioning:

After installation, apply for a net meter. Once the net meter is installed and inspected by the DISCOM, a commissioning certificate will be generated. 

6. Subsidy Disbursement:
Submit your bank account details and a cancelled cheque through the portal. The subsidy will be credited to your account within 30 days. 

Additional information

Brands

,

Sizes

Extra Small, Large, Medium, Small, XL

Reviews

There are no reviews yet.

Be the first to review “PM Surya Ghar Muft Bijli Yojana – 5Kw-Subsidy-94800”
Cart (1 item)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare